15th of May

Location: 15th of May City.

Service Zones: Serving the Southern and Western zones of Cairo Governorate.

Team: About 220 employees to provide 24/7 operation coverage.

Capacity:Approximately 4,000 tons of waste are received and treated on daily basis at the Material Recovery Facilities (MRF) to produce compost and Refuse Derived Fuel (RDF). The project includes two Material Recovery Facilities (MRF) and Engineered Landfill. All wastes collected are treated and the final reject (waste residue) is transported and disposed of at the sanitary landfill. The MRF is equipped with complete treatment lines, where processes include sorting, screening, shredding, air separation, and biological treatment. The project landfill is a sanitary landfill with lining, leachate collection system and gas collection system. The project includes two Material Recovery Facilities (MRF) and Engineered Landfill.